Projects

Confidential Client - Atlanta, GA USA

Premire Insulation - We Got You Coverd

Low Temp Cold Storage/Distribution

Insulation of New Compressor Package (FRICK)

Premier Insulation provides exceptional quality on every installation!

This project included:

  • Pipe Coating and Corrosion
Inhibitor (RG2400)
  • Insulation
  • Painting
  • Labeling

Confidential Client - Shelby, MI USA

Premire Insulation - We Got You Coverd

Produce

New Chiller Insulation

Premier Insulation provides exceptional quality on every installation!

This project included:

  • Pipe Coating and Corrosion
Inhibitor (RG2400)
  • Insulation
  • Painting
  • Labeling

Pork Processing Plant – Low & High Temp Ammonia System

Premire Insulation - We Got You Coverd

Scope: Low & high temp ammonia insulation system assessment & correction.

Results: Premier was able to save the customer future loss and an increased sense of knowledge of their mechanical insulation system and how to properly maintain it.

Along with a more sustainable system, Premier Insulation left us with an increased sense of knowledge of our mechanical insulation system and how to properly maintain it.

Project Highlights

Premier was contracted to report back on the status of the customers’ ammonia insulation system. Previous Insulation contractor the customer hired only specialized in “commercial insulation” and didn’t have the knowledge to install insulation to an Ammonia Refrigerated system.
 
The customer was reporting areas of ice buildup, loose banding on aluminum jacketing, and exposed insulation.
 
Upon performing inspections to piping and vessel insulation, it was determined that the were no vapor barriers installed between insulation and final outside cladding/jacketing, lack of joint staggering leading to separation of insulation, and very little final silicone work done to prevent moisture from penetrating Aluminum jacketing.
 
Premier put together multiple plans of action to correct the most discerning issues first (pipe longevity). Some areas required Insulation to be completely stripped off so the integrity of the piping underneath could be determined. The incorrect installation of previous insulation had caused areas of serious degradation to the piping below and required areas of piping to be changed.
 
Premier was able to save the customer future loss by ; installing Rg-2400 Anti-corrosive Gel prior to new insulation install, installing vapor barrier to areas where insulation was exposed, & re-installing Aluminum jacketing with correct banding and silicone applications to prevent future moisture exposure.

Cold Storage Facility – Ammonia Receivers

Premire Insulation - We Got You Coverd

Scope: Strip and re-insulate multiple low & high pressure receivers.

Results: With new insulation, vapor barrier and jacketing in place, the customer was able to re-install the ammonia into the receiver and have their system back to cooling within days of initial project kick-off.

Time is critical in this industry and Premier had our system back to cooling within days of initial project kick-off.

Project Highlights

The customer was reporting areas of extreme ice buildup on and around the receivers that was preventing safe access of integral valves along with preventing accurate reading of slight columns. High energy costs due to extreme operating conditions were also present.
 
Premier was able to successfully correlate work alongside refrigeration contractor and customer to remove the excessive ice buildup so ammonia could be safety pumped out of receivers. Each vessel was then stripped of ailing insulation and coated with Rg-2400 to prevent future corrosion.
 
With new insulation, vapor barrier and jacketing in place, the customer was able to re-install the ammonia into the receiver and have their system back to cooling within days of initial project kick-off.
 
Premier removed the excessive ice buildup so ammonia could be safety pumped out of receivers. Each vessel was then stripped of ailing insulation and coated with Rg-2400 to prevent future corrosion.
 
With the new insulation, vapor barrier and jacketing installed, the customer was able to restore the ammonia to the receiver and resume their cooling system in a short time after the project started.

Iron Foundry – Rigid Ductwork System

Premire Insulation - We Got You Coverd

Scope: Complete the installation of specialized duct work insulation.

Results: Premier’s creative experience ensured quick and correct installation of insulation and pre-cut steel jacketing.

Premier worked around our facilities production demands with long night shifts and precise correlation.

Project Highlights

Premier was contracted to complete the installation of specialized duct work insulation that previous contactor was not able to finish.
 
The customer reported an outside contractor had procured the duct system from a foreign company and did not have the expertise to install specialized insulation to the rigid ducts.
 
They  feared a loss on previously obtained materials but Premier was able to use its years of creative experience to ensure every piece of insulation and pre-cut stainless steel jacketing could be installed correctly and in an expedient manner.
 
Ingenuity, hard days, and long nights are just a few ways Premier works with customers & personal to ensure down time is prevented.